...
首页> 外文期刊>Bulk materials international >Barcarena port project go-ahead
【24h】

Barcarena port project go-ahead

机译:巴卡雷纳港口项目获准

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Brazil's national waterways transport agency, Antaq, has given Hidrovias do Brasil permission to build its first ever port terminal. This will be at Barcarena, in the state of Para, and be part of a US$581M investment that the company is making in the region's logistics network, which includes two port terminals and a fleet of barges. According to company president Bruno Seapion, part of the capital required has already been identified for all the investment originally envisaged, which will form 40% of the overall budget. The rest will be in the form of debt to be structured by Banco do Brasil.
机译:巴西国家水路运输机构Antaq已批准Hidrovias do Brasil建造其第一个港口码头。该公司将在帕拉州的巴尔卡雷纳(Barcarena)进行投资,这是该公司对该地区物流网络进行的5.81亿美元投资的一部分,该网络包括两个港口码头和一队驳船。据公司总裁Bruno Seapion称,已经为最初设想的所有投资确定了所需资本的一部分,这将占总预算的40%。其余的将以巴西银行(Banco do Brasil)的债务形式进行。

著录项

  • 来源
    《Bulk materials international》 |2014年第julaaauga期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号