...
首页> 外文期刊>Bulk materials international >Vale on course at Nacala
【24h】

Vale on course at Nacala

机译:纳卡拉球场上的淡水河谷

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Brazilian mining firm Vale has announced that it expects to begin exporting coal from the Port of Nacala in September, despite the collapse of a coal stacker at the port. While the nascent Mozambican coal boom has been undermined by lower international prices and delays in developing transport infrastructure, Vale has been one of the few companies to pursue commercial development. The first coal was due to be shipped out of Nacala in the first quarter of this year but floods damaged the partially new 900 km railway line that connects the Moatize coal basin in the northwest of the country with the Port of Nacala on the Indian Ocean. GE is supplying 80 new diesel-electric locomotives for use on the line.
机译:巴西矿业公司淡水河谷已宣布,尽管该港口的一台煤炭堆垛机倒塌,但它仍有望于9月开始从纳卡拉港口出口煤炭。尽管新生的莫桑比克煤炭繁荣受到国际价格下跌和运输基础设施建设延误的破坏,但淡水河谷还是为数不多的追求商业发展的公司之一。第一批煤炭原定于今年第一季度运出纳卡拉,但洪水摧毁了部分新的900公里铁路线,该铁路线连接了该国西北部的Moatize煤盆地与印度洋上的纳卡拉港口。 GE提供了80台用于该生产线的新型柴油机车。

著录项

  • 来源
    《Bulk materials international》 |2015年第julaaauga期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号