首页> 外文期刊>Building >TFL in Metronet risk row
【24h】

TFL in Metronet risk row

机译:Metronet风险行中的TFL

获取原文
获取原文并翻译 | 示例
       

摘要

The government has insisted that the private sector must carry the risk of completing the work of failed London Underground maintenance company Metronet. This is despite the fact that public body Transport for London is the only bidder to take on the contracts. A spokesperson for the Department for Transport said: "The risk must be with the private sector. In the short term the contract will be in the public sector but in the long term we have to see private involvement." If successful in its bid TfL will take over responsibility for the daily maintenance of track and trains, while the private sector would assist in upgrading the lines and stations.
机译:政府坚持认为,私营部门必须承担完成失败的伦敦地铁维护公司Metronet的风险。尽管事实是,伦敦公共交通运输公司是唯一签订合同的投标人。运输部发言人说:“风险一定在私营部门。在短期内,合同将在公共部门进行,但从长远来看,我们必须看到私营部门的参与。”如果竞标成功,TfL将接管轨道和火车的日常维护,而私营部门将协助升级线路和车站。

著录项

  • 来源
    《Building》 |2007年第8505期|p.10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:38:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号