首页> 外文期刊>Building >SUSTAINABLE PROJECT OF THE YEAR (UNDER £2M)
【24h】

SUSTAINABLE PROJECT OF THE YEAR (UNDER £2M)

机译:年度可持续发展项目(200万英镑)

获取原文
获取原文并翻译 | 示例
       

摘要

This project, which was entered by Acme, is an extension to a 19th-century mill keeper's house, combined with a new flood defence and landscaping. The extensions is deliberately low tech, relying on passive design measures to minimise energy requirements. The structure is made from laminated wood, exposed on the inside and clad in charred cedar boards externally. As part of the project, a new flood defence has been completed around the back of the mill, making it possible to abandon all downstream defences, and return 25ha of forest and grassland to their natural state as marsh.
机译:该项目由Acme参与,是对19世纪工厂老板的房屋的扩展,并结合了新的防洪和美化环境。这些扩展故意是低技术的,依靠被动设计措施来最小化能量需求。该结构由层压木制成,内部暴露在外面,外部覆盖着烧焦的雪松木板。作为该项目的一部分,工厂后方已经完成了新的防洪措施,可以放弃所有下游防御措施,并将25公顷的森林和草原恢复为沼泽的自然状态。

著录项

  • 来源
    《Building》 |2009年第47期|76|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:36:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号