The secant pile wall is installed around the perimeter along with the plunge piles and columns.rnThe floor slab at basement level two is cast and the slipform for core construction erected to "jump start" the core. As the core goes up excavation below basement level two continues.rnThe ground floor slab of the building is cast and excavation begins down to level two of the basement.
展开▼