首页> 外文期刊>Building >MANGLED BYTHE MACHINERY
【24h】

MANGLED BYTHE MACHINERY

机译:机械捣碎

获取原文
获取原文并翻译 | 示例
       

摘要

How many contractors would be happy to sign up to a contract that required them to pay liquidated damages to the employer, even though that employer caused the delay to which they related?rnYes, that's pretty much my thought. But that's exactly what the result would be if the notice provisions in many standard form contracts were strictly enforced. rnThese provisions typically require the contractor to give notice of its intention to claim an extension of time within a specified period. If it fails to do so, and the provision is found to be an enforceable "condition precedent", the claim will fail.
机译:有多少承包商愿意签署一份要求他们向雇主支付违约赔偿金的合同,即使该雇主造成了与他们有关的延误呢?是的,这就是我的想法。但是,如果严格执行许多标准格式合同中的通知规定,那么结果就是这样。这些规定通常要求承包商通知其打算在指定期限内延长时间的意图。如果它没有这样做,并且发现该规定是可执行的“条件先例”,则索赔将失败。

著录项

  • 来源
    《Building》 |2010年第8期|56|共1页
  • 作者

    Michael Stewart;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:35:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号