首页> 外文期刊>Building >MUST TRY HARDER
【24h】

MUST TRY HARDER

机译:必须尝试

获取原文
获取原文并翻译 | 示例
           

摘要

When education secretary Michael Gove confirmed a new programme of PFI schools last week, many within the industry, and the education sector, will have breathed a heavy sigh of relief. After years of lambasting the cost and delays associated with some PFI-based school building in the past, notably in the early years of the £55bn Building Schools for the Future programme, and seeking to distance himself from the initiative, Gove finally acknowledged what many commentators had been pointing out throughout a year in which the school building programme was on hold. When it comes down to it, if you have only £15.9bn of capital funds to spend over the next four years, much of which is already committed, and you have two-thirds of the secondary estate and thousands of primaries to renew or expand - you'll probably need to rely on some investment from the private sector.
机译:当教育部长迈克尔·戈夫(Michael Gove)上周确认一项新的PFI学校计划时,业内和教育界的许多人将松一口气。经过多年的沉重负担,过去,尤其是在价值550亿英镑的“未来学校建设”计划的初期,Gove终于意识到了许多举措的成本和延误,并努力与这项计划保持距离。在整个学校建设计划被搁置的一年中,评论员一直在指出。归根结底,如果您在未来四年中仅能花费159亿英镑的资本资金,其中大部分已经投入,并且您有三分之二的二手房和数千个二手房需要更新或扩展-您可能需要依靠私营部门的一些投资。

著录项

  • 来源
    《Building》 |2011年第30期|p.20|共1页
  • 作者

    Sarah Richardson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号