首页> 外文期刊>Building >SPECIAL AWARD: EMERGENCY ENGINEERING
【24h】

SPECIAL AWARD: EMERGENCY ENGINEERING

机译:特别奖:紧急工程

获取原文
获取原文并翻译 | 示例
       

摘要

When the Hammersmith Flyover had to be closed in December 2011 due to serious structural corrosion it looked as if West London was going to be gridlocked for years. The Olympics were less than a year away so a quick solution was needed to keep traffic moving during this critical period and take pressure off commuters and residents. Road salt-induced corrosion had eaten away post tensioning cables to the point the flyover was in danger of collapse. Amey worked on an open book, collaborative basis with Transport for London to get a job that would normally take up to two years to finish done in 23 weeks.
机译:当Hammersmith天桥由于严重的结构腐蚀而不得不在2011年12月关闭时,看起来西伦敦似乎将陷入多年的僵局。距奥运会还不到一年,因此需要一种快速的解决方案来在此关键时期保持交通畅通,并减轻通勤者和居民的压力。道路盐引起的腐蚀在张紧电缆后已被吞噬,直至天桥处于倒塌的危险中。 Amey与伦敦运输公司合作,以开放书本的形式工作,通常需要长达两年的工作才能在23周内完成工作。

著录项

  • 来源
    《Building》 |2013年第10期|40-40|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:34:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号