首页> 外文期刊>Building >Tackling the energy performance challenge
【24h】

Tackling the energy performance challenge

机译:应对能源绩效挑战

获取原文
获取原文并翻译 | 示例
       

摘要

Despite the lack of decisions by the government on Part L of the Building Regulations and its zero carbon policy, there was one ministerial announcement at Ecobuild last week that will lead to action in a vital area - closing any gap between the expected and as-built energy performance, and therefore C0_2 performance, of new homes.Building regulations minister Don Foster has commissioned the Zero Carbon Hub to lead an industry-wide project to examine the construction process - from design and planning to testing and verification - to help identify areas where an energy use "performance gap" might be occurring.
机译:尽管政府缺乏关于《建筑法规》第L部分及其零碳政策的决定,上周在Ecobuild上发布了一项部长级公告,这将导致在重要领域采取行动-缩小预期与竣工之间的差距建筑法规部长唐·福斯特(Don Foster)委托零碳中心领导一个全行业项目,审查从设计,规划到测试和验证的施工过程,以帮助确定哪些区域可能会出现能源使用“性能差距”。

著录项

  • 来源
    《Building》 |2013年第10期|15-15|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:34:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号