【24h】

About time

机译:关于时间

获取原文
获取原文并翻译 | 示例
       

摘要

When the previous government introduced Construction 2025, it reinvigorated the key areas the sector must focus on to be fit for the future. The plan laid out some ambitious goals in "big ticket" areas such as carbon reduction, exports and costs. The other key measure focused on faster project delivery, calling for a 50% reduction in the time taken to design and build projects. It's easy to see why central government would want to see construction times reduced. Aside from cost and time being inextricably linked, an industry that can deliver projects quicker is one that is worth investing in. If returns were quicker in coming, it would encourage business to invest in modernising the built environment, which is key to eliminating the boom-and-bust cycle of the construction industry. Indeed, this confidence is not only vital for the construction industry, it's also necessary to encourage more overseas investment into the UK, to maintain competitive advantage over other markets.
机译:上届政府推出《 2025年建筑》时,它重新激发了该行业必须适应未来发展的重点领域。该计划在“大笔钱”领域提出了一些雄心勃勃的目标,例如减少碳排放,出口和成本。另一个关键措施着眼于更快的项目交付,要求将设计和构建项目所花费的时间减少50%。很容易理解为什么中央政府希望减少施工时间。除了成本和时间有着千丝万缕的联系之外,一个可以更快地交付项目的行业是值得投资的行业。如果回报更快,它将鼓励企业投资于建筑环境的现代化,这是消除繁荣的关键建筑业的兴衰周期。的确,这种信心不仅对建筑业至关重要,而且还必须鼓励更多的海外投资进入英国,以保持与其他市场的竞争优势。

著录项

  • 来源
    《Building》 |2015年第49期|29-29|共1页
  • 作者

    Robert Barclay;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:33:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号