首页> 外文期刊>Building >Interserve warns shedding waste arm will now cost £160m
【24h】

Interserve warns shedding waste arm will now cost £160m

机译:Interserve警告,削减废料臂将耗资1.6亿英镑

获取原文
获取原文并翻译 | 示例
           

摘要

Interserve has said the cost of closing its energy-from-waste business will more than double to £160m. The contractor, which is due to release its full-year results next week, said last August it was getting out of the sector after racking up £70m-plus losses. But in an update to the London Stock Exchange on Monday, the firm said its provision for costs related to exiting the market had now spiralled to £160m because of continuing uncertainties over the conclusion of the contracts and an expected lengthy period of litigation over the firm's removal from the £150m Glasgow Recycling & Renewable Energy project.
机译:Interserve表示,关闭其垃圾产生的能源业务的成本将翻一番以上,达到1.6亿英镑。该承包商将于下周发布全年业绩,该承包商去年八月表示,在亏损超过7000万英镑之后,该公司便退出了这一领域。但在周一伦敦证券交易所的最新动态中,该公司表示,由于退出合同的持续不确定性以及预计该公司诉讼的漫长时间,其退出市场的费用准备金现已升至1.6亿英镑。耗资1.5亿英镑的格拉斯哥回收与可再生能源项目。

著录项

  • 来源
    《Building》 |2017年第8期|13-13|共1页
  • 作者

    Louise Dransfield;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号