WHAT KIND OF QUESTION IS THAT?

机译:那是什么问题?

获取原文
获取原文并翻译 | 示例
           

摘要

It a was brilliant idea; it just didn't work. Brilliant all the same. It was an attempt to take the adjudicator's decisions on appeal. ISG Construction Ltd was awarded a £29m design and build office block in Lombard Street, London EC3. The design, supply and installation of the unitised curtain walling and stone cladding was subcontracted to English Architectural Glazing Ltd (EAG). Its contract said it would commence works on site on 20 March 2017 and finish on 11 September 2017. By coincidence the finish date became the eventual start date, and over a year later the subcontract was all but done. A highly promising circumstance for a dispute - and indeed, ISG said that EAG was not entitled to all that extension of time, and claimed £3,183,000 compensation. Big money.
机译:这是聪明的主意;它只是不起作用。辉煌一切。它试图采取裁决者对上诉的决定。 ISG Construction Ltd被授予伦敦EC3的伦巴第街2900万英镑的设计和建造办公楼。整套幕墙和石材包层的设计,供应和安装是对英语建筑玻璃玻璃有限公司(EAG)的分包。其合同表示,它将在2017年3月20日开始在现场开始工作,并于2017年9月11日结束。巧合结束日期成为最终的开始日期,一年多后,分包代表都是如此。对争端的一个高度有希望的情况 - 事实上,ISG表示,EAG无权延伸时间,并声称赔偿3,183,000英镑。一大笔钱。

著录项

  • 来源
    《Building》 |2020年第7期|39-39|共1页
  • 作者

    Tony Bingham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号