首页> 外文期刊>Building journal Hong Kong China >Burghley Hill to complete in early 2012
【24h】

Burghley Hill to complete in early 2012

机译:Burghley Hill将于2012年初完成

获取原文
获取原文并翻译 | 示例
       

摘要

(GUANGZHOU) Burghley Hill, the final phase of the Cambridgeshire Agile residential development, is located in the Panyu district of Guangzhou. The entire Cambridgeshire development occupies an area of 620,000 sq m and fronted by 1 kilometer of the Pearl River waterway. Burghley Hill comprises 18 tower blocks. Each tower block has 30 storeys with 4 to 6 units per floor. The units are available in various configurations and sizes ranging from 105 sq m 3-bed room unit to 177 sq m 4-bed room unit. All units are furnished tastefully and equipped with electrical appliances.
机译:(广州)剑桥郡敏捷住宅开发的最后阶段Burghley Hill位于广州市番yu区。整个剑桥郡开发项目占地62万平方米,并以1公里的珠江水道为界。伯格利山(Burghley Hill)由18个塔楼组成。每个塔楼有30层,每层4至6个单位。这些单位有各种配置和尺寸,从105平方米的三居室单元到177平方米的四居室单元。所有单元都布置高雅,并配有电器。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号