首页> 外文期刊>Building design >Inquiry hears building control ‘confused’ cavity barriers for firestops
【24h】

Inquiry hears building control ‘confused’ cavity barriers for firestops

机译:询问听闻建筑控制系统“混淆”了防火闸的空腔屏障

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Building control officers responsible for signing off the proposals to overclad Grenfell Tower as part of its ill-fated refurbishment did not understand the difference between cavity barriers and firestopping, Studio E Architects' project Lead has said.On his Last day of evidence to the GrenfeLL Inquiry, Neil Crawford related "frustrating" exchanges with Kensington and Chelsea council's building control officers over plans to Limit the spread of fire between the original concrete exterior and the new envelope proposed for the 24-storey block.
机译:Studio E Architects的项目负责人表示,负责为翻新Grenfell塔进行翻新工程的建筑控制人员不了解空腔屏障与防火之间的区别。询问中,尼尔·克劳福德(Neil Crawford)与肯辛顿和切尔西议会的建筑控制官员进行了“令人沮丧的”交流,以计划限制原混凝土外墙与拟议的24层高新围护结构之间的火势蔓延。

著录项

  • 来源
    《Building design》 |2020年第3期|1-3|共3页
  • 作者

    Jim Dunton;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号