首页> 外文期刊>Building design & construction >MOBILE EMERGENCY ROOM ARRIVES JUST IN TIME FOR ALABAMA HOSPITAL
【24h】

MOBILE EMERGENCY ROOM ARRIVES JUST IN TIME FOR ALABAMA HOSPITAL

机译:紧急房间及时赶到阿拉巴马州医院

获取原文
获取原文并翻译 | 示例
           

摘要

GROVE HILL (ALA.) MEMORIAL HOSPITAL is adding a new $3.75 million, 4,500-sf emergency department that will house nine exam and treatment rooms, a two-bay trauma room, expanded waiting area, and direct access to operating rooms within the hospital. During several months of construction that started last November, Grove Hill couldn't shut down its existing ED because it's the only one serving Clark County. And the hospital's administration determined that converting unutilized space into a temporary ED would be too costly.
机译:GROVE HILL(阿拉巴马州)纪念医院将增加一个新的375万美元,占地4,500平方英尺的急诊室,将设有9个检查和治疗室,2个隔间的创伤室,扩展的等候区,并直接进入医院的手术室。在去年11月开始的几个月建设中,格罗夫·希尔无法关闭其现有的ED,因为它是唯一为Clark县提供服务的ED。医院的管理部门认为将未利用的空间转换为临时的ED会非常昂贵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号