首页> 外文期刊>Building and construction law >Concurrent and sequential causes of delay
【24h】

Concurrent and sequential causes of delay

机译:并发和顺序的延迟原因

获取原文
获取原文并翻译 | 示例
           

摘要

Delays to progress and to completion inevitably occur on the majority of building and construction projects. There are a multitude of potential causes of those delays. The risk of bearing the effects of those causes are allocated, under the terms of the contract or at law, between the owner and contractor. Factual and legal complexity arises when more than one cause of delay overlaps, or is concurrent with, another cause of delay. There may also be concurrent effects attributable to delaying events that have arisen at different times.
机译:大多数建筑项目都不可避免地会拖延进度和竣工。造成这些延误的原因很多。根据合同条款或法律,在所有者和承包商之间分配承担这些原因的风险。当一个以上的延迟原因与另一种延迟原因重叠或同时发生时,事实和法律上的复杂性就会增加。在不同时间发生的延迟事件也可能会产生并行影响。