首页> 外文期刊>Building and construction law >Performance anxiety - intention and ability to rectify and the award of rectification damages
【24h】

Performance anxiety - intention and ability to rectify and the award of rectification damages

机译:表现焦虑-纠正的意图和能力以及纠正损害的赔偿

获取原文
获取原文并翻译 | 示例
       

摘要

The foundational Australian case Bellgrove v Eldridge established that the prima facie measure for defective building works in breach of contract was the amount of damages required to rectify the defective works. However, recent Australian cases have suggested that rectification damages may not be available where a plaintiff does not intend to carry out rectification works or is unable to do so because they no longer own the defective building. After surveying relevant case law, this article argues that contract law should require builders to pay rectification damages irrespective of the plaintiff's intention or ability to rectify, as doing so will provide appropriate and necessary protection to the plaintiff's interest in exact contractual performance and will produce favourable risk allocation outcomes.
机译:澳大利亚的基础性案例Bellgrove诉Eldridge裁定,针对有缺陷的建筑工程违反合同的初步措施是纠正有缺陷的工程所需的赔偿金。但是,最近的澳大利亚案件表明,如果原告不打算进行纠正工作或由于他们不再拥有有缺陷的建筑物而无法进行纠正工作,则可能无法获得纠正赔偿。在调查了相关判例法之后,本文认为合同法应要求建设者支付赔偿金,而不论原告的意图或矫正能力如何,因为这样做将为原告的确切合同履行利益提供适当和必要的保护,并会产生有利的结果。风险分配结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号