首页> 外文期刊>BT Technology Journal >ARMS—application of Al and OR methods to resource management
【24h】

ARMS—application of Al and OR methods to resource management

机译:ARMS-Al和OR方法在资源管理中的应用

获取原文
获取原文并翻译 | 示例
       

摘要

This paper documents work on automating resource management in BT Retail. BT Retail manages BT's access network and provides telecommunications services to its customers. BT Retail's field engineers are allocated jobs via an information system known as Work Manager. In order to proactively position the engineers (i.e. resources) so as to service jobs in an optimal manner, resource managers are involved in analysing the profiles of engineers in the light of incoming jobs and 'selecting' those profiles that will yield best quality of service and reduce operational costs. A profile is a set of attributes that define a resource's capabilities (i.e. skills), capacity (i.e. availability), and location (i.e. area). Resource planning involves identifying an 'optimal' set of resource profiles. Accurate workload forecasting is sine qua non for optimal resource planning. To this end we have developed ARMS, Automated Resource Management System, a suite of components for workload forecasting and resource planning.
机译:本文记录了BT Retail中资源管理自动化的工作。 BT Retail管理着BT的接入网,并为其客户提供电信服务。 BT Retail的现场工程师通过称为工作管理器的信息系统分配工作。为了主动定位工程师(即资源)以便以最佳方式为工作提供服务,资源管理人员会根据进来的工作来分析工程师的资料,并“选择”那些能够提供最佳服务质量的资料并降低运营成本。配置文件是一组属性,这些属性定义资源的能力(即技能),能力(即可用性)和位置(即区域)。资源计划涉及识别一组“最佳”资源配置文件。准确的工作量预测对于优化资源计划是必要的。为此,我们开发了ARMS(自动资源管理系统),这是一套用于工作量预测和资源计划的组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号