...
首页> 外文期刊>Bridge structures >Monitoring of a bascule bridge during rehabilitation
【24h】

Monitoring of a bascule bridge during rehabilitation

机译:康复过程中的吊桥监控

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The risk of member/connection distress or even overall collapse of bridge structures under significant rehabilitation efforts is generally greater than when subject to normal operating conditions and hazards. This is particularly evident for movable structures. Currently, visual inspection during construction is the most common source of assurance a bridge owner has that the structure is functioning properly. Complex structures like movable bridges may benefit from additional oversight beyond visual inspection because of the elevated risks. Structural health monitoring of critical elements can help reduce these risks. A case study is presented for the first monitoring effort of a rolling lift bascule bridge under rehabilitation. During an opening of the span for ship traffic, a 460με (92 MPa or 13.3 ksi) shift in strain response was measured in the truss lower chord. To identify the root cause of this behavior, a detailed investigation was performed including field studies, interviews and model-experiment correlation. It was concluded that a connection slip occurred at a partially completed repair. Fortunately the structural system utilized on this bascule span includes a partially redundant truss which allowed for redistribution of forces. In this scenario, the primary impact of the monitoring was a change to the construction sequence allowed by the contractor. This investigation shows the potential benefit of instrumentation and monitoring in conjunction with traditional visual assessment methods, specifically during construction and retrofit of a movable bascule bridge.
机译:在重大的修复工作中,构件/连接件陷入困境甚至桥梁结构整体倒塌的风险通常要比受到正常操作条件和危害的情况更大。这对于可移动结构尤其明显。当前,在施工期间进行外观检查是桥梁所有者确保结构正常运行的最常见保证。诸如活动桥之类的复杂结构可能会因风险增加而受益于目视检查以外的其他监督。对关键要素进行结构健康监控可以帮助减少这些风险。提出了一个案例研究,说明了在翻修过程中滚动升降桥的首次监测工作。在为船舶交通打开跨度期间,在桁架下弦中测得应变响应变化了460με(92 MPa或13.3 ksi)。为了确定这种行为的根本原因,进行了详细的调查,包括现场研究,访谈和模型与实验的相关性。结论是,在部分完成的维修中发生了连接滑移。幸运的是,在此基础跨度上使用的结构系统包括部分多余的桁架,可用于重新分配力。在这种情况下,监视的主要影响是承包商允许的施工顺序发生了变化。这项调查显示了与传统的视觉评估方法结合使用的仪器和监视的潜在好处,特别是在活动式桥式桥梁的建造和改造过程中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号