首页> 外文期刊>Bridge design & engineering >NEW MOTORWAY SPAN BROUGHT TO SITE ON WHEELS
【24h】

NEW MOTORWAY SPAN BROUGHT TO SITE ON WHEELS

机译:即将在车轮上兴建的新高速公路跨区

获取原文
获取原文并翻译 | 示例
           

摘要

Global heavylift and transportation company ALE was contracted to complete the transportation and installation of a new bridge for the 154 project in South Staffordshire in the UK. The project has seen considerable investment by three local councils and involves the 91Ha site being turned into a major business park with the potential to create hundreds of jobs in the area. The 45m-long bridge replaced a previous crossing and will allow access to what will be a new motor engine plant and water treatment works. The bridge will also serve as a public footpath and bridleway across the M54 motorway near Wolverhampton.
机译:全球重型起重运输公司ALE与英国南斯塔福德郡154工程的合同完成了新桥的运输和安装。该项目已得到三个地方议会的大量投资,涉及91Ha场地被变成一个主要的商业园区,并有可能在该地区创造数百个就业机会。这座长45m的桥取代了以前的过境点,将使人们能够进入新的发动机工厂和水处理厂。这座桥还将成为一条公共小径,并穿过沃尔夫汉普顿附近的M54高速公路。

著录项

  • 来源
    《Bridge design & engineering》 |2013年第71期|70-70|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号