...
首页> 外文期刊>Bridge design & engineering >KOREAN SPAN BENEFITS FROM SIMULTANEOUS LIFT
【24h】

KOREAN SPAN BENEFITS FROM SIMULTANEOUS LIFT

机译:同时提升韩国韩式特色

获取原文
获取原文并翻译 | 示例

摘要

Four Enerpac HSL8500 strand jacks each supporting 850t were installed on a temporary bent tower to simultaneously lift and position two 2,000t cable-stayed towers at 75° on the Songdo 4th Bridge in South Korea. The bridge will provide a vital link between Incheon International Airport and New Songdo City, a rapidly expanding Urban Tech-Center. The construction of the latest bridge section involved the lifting and positioning of two 2,000t cable-stayed towers. In order to prevent problems with counter-balance issues it was critical to erect both elements simultaneously and within a very tight tolerance. Even the slightest counter-balance would have created a lop-sided load, creating serious pressure and intolerable stress levels on the centre pier.
机译:将四个分别支持850吨的Enerpac HSL8500绞线千斤顶安装在临时弯曲的塔架上,以同时在韩国的松岛第四桥上将两个2,000吨斜拉塔以75°的角度吊装和放置。这座桥梁将成为仁川国际机场和快速发展的城市技术中心新松岛市之间的重要纽带。最新桥段的建设涉及到两座2,000吨斜拉塔的吊装和定位。为了防止出现平衡问题,至关重要的是要同时在非常严格的公差范围内同时安装两个元件。即使是最轻微的平衡,也可能会产生侧向载荷,从而在中心墩上产生严重的压力和无法承受的应力水平。

著录项

  • 来源
    《Bridge design & engineering 》 |2014年第76期| 64-64| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号