...
首页> 外文期刊>Brauwelt international >Brewhouse upgrade during normal operation
【24h】

Brewhouse upgrade during normal operation

机译:正常运行期间啤酒厂升级

获取原文
获取原文并翻译 | 示例
           

摘要

The replacement of two lauter tuns at Paulaner Brewery in Munich was a race against time for GEA Brewery Systems in Kitzingen. During normal operation, the old lauter tuns had to be dismantled, the new ones had to be installed and put into operation. And for each tun, only three weeks were available to complete the replacement. To say it right away: GEA Brewery Systems won the race. In Munich, BRAUWELT International talked to Christian Dahncke, Production Manager at Paulaner Brewery, Matthias Gerner, Commissioning Engineer at GEA Brewery Systems, and Marc Schreder, Sales Manager Germany at GEA Brewery Systems.
机译:在基辛根的GEA啤酒厂系统与时间的竞赛是在慕尼黑Paulaner啤酒厂更换两个过滤网。在正常运行期间,必须拆除旧的过滤桶,必须安装新的并投入运行。而且对于每个隧道,只有三个星期可以完成更换。马上说:GEA Brewery Systems赢得了比赛。在慕尼黑,BRAUWELT International与Paulaner Brewery的生产经理Christian Dahncke,GEA Brewery Systems的调试工程师Matthias Gerner和GEA Brewery Systems的德国销售经理Marc Schreder进行了交谈。

著录项

  • 来源
    《Brauwelt international》 |2011年第5期|p.330-331|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号