首页> 外文期刊>BOHSR newsletter >Environmental Protection Preparations for the Construction of the Three New HSR Stationst
【24h】

Environmental Protection Preparations for the Construction of the Three New HSR Stationst

机译:三座新高铁站建设的环境保护准备

获取原文
获取原文并翻译 | 示例
           

摘要

The construction operations of the three new HSR stations are now in full swing. Among the tasks, the preparation work for environmental protection is an important one. The "Analysis Report on the Difference of the Environmental Impact" was completed by BOHSR and was approved by the Environmental Protection Administration (EPA) for future reference (the one for Yunlin Station was approved for future reference on July 13th, 2012; Changhua Station on September 25th, 2012, and Miaoli Station on October 19th, 2012).
机译:现在,三个新的高铁站的建设工作正在紧锣密鼓地进行。在各项任务中,环境保护的准备工作是重要的一项。 BOHSR已完成“环境影响差异分析报告”,并已获得环境保护总局(EPA)的批准,以备将来参考(云林站的一份报告已于2012年7月13日获得批准供将来参考; 2012年9月25日,苗栗站(2012年10月19日)。

著录项

  • 来源
    《BOHSR newsletter》 |2013年第205期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号