首页> 外文期刊>The banker >A chance to win business benefits
【24h】

A chance to win business benefits

机译:赢得商业利益的机会

获取原文
获取原文并翻译 | 示例
       

摘要

One of the chief drawbacks of Basel I was its inability to demand that capital be held by banks commensurate with their underlying risk. The Basel Committee, therefore, initiated work on Basel II with this underlying purpose and attempted to construct rules to this effect. The endeavour has been partially fulfilled, particularly for banks following the advanced approaches. Basel II, further, has a menu of approaches to credit risk to allow banks to evolve gradually: from a relatively easy-to-implement method like the standardised approach to an advanced internal ratings-based (IRB) approach.
机译:《巴塞尔协议一》的主要弊端之一是它无法要求银行持有与其潜在风险相称的资本。因此,巴塞尔委员会为此目的启动了关于巴塞尔协议II的工作,并试图为此制定规则。这项努力已经部分实现,尤其是对于采用先进方法的银行。此外,《巴塞尔协议二》还提供一系列信贷风险方法,以使银行逐步发展:从相对容易实现的方法(例如标准化方法)到高级的基于内部评级的方法(IRB)。

著录项

  • 来源
    《The banker》 |2005年第957期|p.101-102|共2页
  • 作者

    Ravi Varadachari;

  • 作者单位

    Credit Risk, at i-flex;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 f;
  • 关键词

  • 入库时间 2022-08-17 23:43:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号