首页> 外文期刊>Aviation Daily >BA Plans Massive Vehicle Relocation On Eve Of T5 Debut
【24h】

BA Plans Massive Vehicle Relocation On Eve Of T5 Debut

机译:广管局计划在T5首次亮相前夕进行大规模的车辆搬迁

获取原文
获取原文并翻译 | 示例
           

摘要

British Airways plans to move more than 1,000 vehicles, aircraft and equipment items across Heathrow airport tonight, to prepare for the opening of its new Terminal 5. The south runway will be closed between 11 p.m and 4 am while the vehicles shift from Terminals 1 and 4 to Terminal 5. However, airport operations will not be affected. "Putting up the closed for business sign [at Heathrow] is not an option...this is a massive logistical exercise, which is without parallel," BA CEO Willie Walsh said.
机译:英国航空公司计划今晚在希思罗机场上空运送1,000多架车辆,飞机和设备,为新5号航站楼的开业做准备。南跑道将在晚上11点至凌晨4点之间关闭,而车辆将从1号航站楼和4号航站楼转移。 4至5号候机楼。但是,机场运营不会受到影响。英航首席执行官威廉·沃尔什(Willie Walsh)说:“在[希思罗机场(Heathrow)]封闭商业标志是不可行的……这是一项大规模的后勤工作,这是不可能做到的,”英航首席执行官威廉·沃尔什说。

著录项

  • 来源
    《Aviation Daily》 |2008年第59期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号