...
首页> 外文期刊>AV Magazine >Staging a spectacular
【24h】

Staging a spectacular

机译:暂存壮观

获取原文
获取原文并翻译 | 示例

摘要

The Royal Albert Hall's iconic auditorium was filled with a different type of energy last time I visited. My tour coincided with a week of refur-bishments, which take place every April and September, so instead of being surrounded by an eager audience I was accompanied by 500 contractors carrying out maintenance. "We're working on so many technical and aesthetic projects at the moment but refurbishment is an ongoing process inside and outside." says Oliver Jeffery, the Royal Albert Hall's head of technical and production, as we sit in the new box seats, gazing out at the monumental space. "The 50 or more projects include internal restoration schemes, replacing existing seats and looking at how to better handle the 140 motors in the roof."
机译:皇家阿尔伯特霍尔的标志性礼堂上次被我去过的时候充满了不同类型的能源。我的旅游恰逢一周的refur-bishments,每年4月和9月举行,所以而不是被渴望的观众包围,而我伴随着500个承包商进行维修。 “我们目前正在努力这么多的技术和审美项目,但翻新是内外的持续进程。” Oliver Jeffery说,皇家Albert Hall的技术和生产负责人,因为我们坐在新箱子座位上,凝视着纪念碑的空间。 “50个或更多项目包括内部修复方案,取代现有座位,并查看如何更好地处理屋顶上的140电机。”

著录项

  • 来源
    《AV Magazine》 |2019年第5期|56-5860|共4页
  • 作者

    Zoe Mutter;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号