Development of an integrated information resource base for 4D/VR construction processes simulation

机译:开发用于4D / VR施工过程仿真的集成信息资源库

获取原文
获取原文并翻译 | 示例
           

摘要

The objective of this paper is to report on the development of an integrated database to act as an information resource base for 4D/VR construction process simulation. A comprehensive database was designed, implemented and populated with the School of Health Construction Project (a £8 million, three-story development at the University of Teesside campus). The database is composed of a core database of building components which is in turn, integrated with a CAD package (AUTOCAD 2000), a Project Management Package (MS Project) and Graphical User Interfaces. The core database was designed using Standard Classification Methods (Uniclass). One of the benefits of using the Uniclass method, a part from providing standards for structuring building information, is that it provides a media for integrating Product Breakdown Structure (PBS) with Work Breakdown Structure (WBS). This is an important aspect for delivering a meaningful 4D model. Integrated interfaces between MS Access Database, AutoCAD Drawings and MS Project Schedules were developed and implemented. Furthermore, the British Standards of layering convention (BS 1192-5) was adapted and implemented and justification for this is given in the part 2 of this document. The database was populated with detailed 2D drawings (whole building and M&E), schedules of work and resources of the School of Health Project. This paper is also addressing object definition, structuring the data, and establishing the relationships and dependencies within the data set, the WBS and building objects as well as modelling the building in 3D in order to capture the essential space- and time-critical attributes of tasks. Practical application of database throughout the construction process has been highlighted and discussed.
机译:本文的目的是报告集成数据库的开发情况,该数据库可作为4D / VR施工过程仿真的信息资源库。设计,实施和填充了一个综合数据库,其中包括卫生建设项目学院(蒂赛德大学校园三层开发项目,耗资800万英镑)。该数据库由建筑组件的核心数据库组成,该数据库又与CAD软件包(AUTOCAD 2000),项目管理软件包(MS Project)和图形用户界面集成在一起。核心数据库是使用标准分类方法(Uniclass)设计的。使用Uniclass方法的好处之一,是提供建筑信息结构标准的一部分,它的优点是它提供了一种将产品分解结构(PBS)与工作分解结构(WBS)集成在一起的媒体。这是交付有意义的4D模型的重要方面。开发并实现了MS Access数据库,AutoCAD工程图和MS项目进度表之间的集成界面。此外,对分层协议的英国标准(BS 1192-5)进行了改编和实施,其合理性在本文档的第2部分中给出。该数据库填充有详细的2D图纸(整栋建筑和M&E),卫生学院项目的工作时间表和资源。本文还讨论了对象定义,数据结构以及建立数据集,WBS和建筑物对象内的关系和依存关系,以及在3D模型中对建筑物进行建模,以捕获空间的关键空间和时间关键属性的问题。任务。数据库在整个构建过程中的实际应用已得到强调和讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号