首页> 外文期刊>Automation in construction >Building Management Simulation Centre
【24h】

Building Management Simulation Centre

机译:楼宇管理模拟中心

获取原文
获取原文并翻译 | 示例
           

摘要

A unique training centre for construction management has recently been built in the Netherlands. The aim when developing the BMSC was to have maximum control over the training circumstances and to collect as much data as possible about the trainee, during the training. A new centre was therefore built and a new course system was implemented. The centre consists of a virtual building site, a (real) site hut for the trainees and a control room. The course system intermediates between the trainee, the trainer and the building site. A central role in the course system is played by so-called transitions, which are composed of activities that have to be performed by the trainee. An activity is fulfilled by entering web-based forms with the right content and in the right order. Interaction with the trainee is also established through actors that interrupt the planned flow of activities. After a training session, the system can reproduce all actions that were taken; it can show the consequences for the building and present the construction management performance.
机译:最近在荷兰建立了一个独特的建筑管理培训中心。开发BMSC的目的是在培训期间最大程度地控制培训环境并收集尽可能多的有关受训者的数据。因此,建立了一个新的中心并实施了一个新的课程系统。该中心由一个虚拟建筑工地,一个供学员使用的(真实)工房和一个控制室组成。课程系统介于受训者,培训者和建筑工地之间。在课程系统中的核心作用是所谓的过渡,它由学员必须执行的活动组成。通过输入具有正确内容和正确顺序的基于Web的表单来完成活动。与受训人员的互动也是通过中断计划中的活动流程的参与者建立的。培训课程结束后,系统可以重现已执行的所有操作;它可以显示对建筑物的影响并显示施工管理绩效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号