Construction management process reengineering: Organizational human resource planning for multiple projects

机译:施工管理流程再造:多个项目的组织人力资源计划

获取原文
获取原文并翻译 | 示例
       

摘要

Applying the business process reengineering and organization planning philosophy, this study focuses on human resource planning in construction management process reengineering (CMPR) to develop a team-based human resource planning (THRP) method for deploying laborpower. The THRP method has two purposes; the first is to determine the maximum loading of projects the original laborpower can carry, and the second is to identify the range of laborpower required for expected project loadings in the future. The THRP method includes four phases, namely, process reengineering, data preparing, human resource allocation, and simulation. Using the THRP method, a construction company cannot only design a team-based organizational structure, but also allocate human resources based on cross-functional processes. Moreover, human resource utilizations before and after CMPR can be compared to evaluate savings attributable to the CMPR. As a consequence, optimum laborpower can be assessed, and human resources allocated to fit the changing processes and circumstances of a construction company's growing business.
机译:本研究应用业务流程再造和组织计划哲学,着重于施工管理流程再造(CMPR)中的人力资源计划,以开发基于团队的人力资源计划(THRP)方法来部署劳动力。 THRP方法有两个目的:首先是确定原始劳动力可以承载的最大项目负荷,其次是确定将来预期项目负荷所需的劳动力范围。 THRP方法包括四个阶段,即流程再造,数据准备,人力资源分配和仿真。使用THRP方法,建筑公司不仅可以设计基于团队的组织结构,而且可以基于跨职能流程分配人力资源。此外,可以比较CMPR前后的人力资源利用率,以评估可归因于CMPR的节省额。因此,可以评估最佳劳动力,并分配人力资源以适应建筑公司不断发展的业务不断变化的流程和环境。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号