首页> 外文期刊>Automation in construction >GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks
【24h】

GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks

机译:基于GA的钢筋混凝土(RC)桥面板最佳修复和修复方法选择算法

获取原文
获取原文并翻译 | 示例
           

摘要

Korean government agencies manage bridge structures at the network level using a Bridge Management System (BMS). One of the most important functions of the BMS is to provide the agencies with an effective decision making tool for managing bridges. Especially, it is very important for the BMS to assist in prioritizing routine maintenance, repair, rehabilitation, and replacement activities to optimize the given constrained budgets. This paper suggests an algorithm for the BMS to prioritize bridge maintenance activities at the network level and to show its implementation. The selection of maintenance activities can be modeled as a multi-objective combinatorial optimization problem. A genetic algorithm is used to solve it. Using bridge decks as an example, the application of genetic algorithms is demonstrated and the feasibility of the suggested methodology is examined through some numerical case studies.
机译:韩国政府机构使用网桥管理系统(BMS)在网络级别管理网桥结构。 BMS的最重要功能之一就是为代理商提供管理桥梁的有效决策工具。特别是,对于BMS而言,协助优先进行日常维护,维修,修复和更换活动以优化给定的受约束预算非常重要。本文提出了一种BMS的算法,该算法可以在网络级别对网桥维护活动进行优先级排序并展示其实现。维护活动的选择可以建模为多目标组合优化问题。使用遗传算法来解决它。以桥面板为例,论证了遗传算法的应用,并通过一些数值案例研究了该方法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号