首页> 外文期刊>Automation in construction >BIM implementation throughout the UK construction project lifecycle: An analysis
【24h】

BIM implementation throughout the UK construction project lifecycle: An analysis

机译:在英国建筑项目整个生命周期中实施BIM:分析

获取原文
获取原文并翻译 | 示例
           

摘要

Substantial impacts through BIM implementation may be achieved throughout all stages of the construction process. The paper measures BIM use throughout the project lifecycle, confirming BIM is most often used in the early stages with progressively less use in the latter stages. This research demonstrates via 92 responses from a sample of BIM users that collaboration aspects produce the highest positive impact. The process aspects are more important than the software technology. BIM necessitates investment in software and training however, smaller practices can afford it. Stakeholder financial benefits are ranked concluding that clients benefit most financially from BIM followed by Facilities Managers. Despite this, over 70% do not provide a 3D model and Cobie dataset at the conclusion of a project. Identification of Key Performance Indicators currently being used for BIM is provided and findings indicate a lack of industry expertise and training providing an opportunity for education providers.
机译:通过BIM实施的实质性影响可以在施工过程的所有阶段中实现。本文测量了整个项目生命周期中BIM的使用情况,证实了BIM最常在早期使用,而在后期则逐渐减少。这项研究通过从BIM用户样本中获得92项回应证明,协作方面产生了最大的积极影响。过程方面比软件技术更重要。 BIM需要在软件和培训上进行投资,但是,较小的实践可以负担得起。利益相关者的财务利益排名包括:客户从BIM收益最大,其次是设施经理。尽管如此,超过70%的人在项目结束时仍未提供3D模型和Cobie数据集。提供了当前用于BIM的关键绩效指标的标识,发现表明缺乏行业专业知识和培训为教育提供者提供了机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号