Documentation errors in instrumentation and electrical systems: Toward productivity improvement using System Information Modeling

机译:仪器和电气系统中的文档错误:使用系统信息建模来提高生产率

获取原文
获取原文并翻译 | 示例
       

摘要

Documentation errors have been identified as a significant problem within the construction and engineering industry. Errors contained with contract documents can contribute to loss of profit, reduced productivity, and cost and time overruns as well as contractual disputes. Research has identified that as much as 60% of variations in construction and engineering projects are a result of errors and omissions contained within poor quality documentation. Considering this alarming statistic and the impact that poor quality documentation can have on productivity, the research presented in this paper classifies and quantifies errors in 106 drawings and the cable schedule used to document for the electrical package for an Iron Ore Stacker Conveyor. The research reveals that Computer Aided Design (CAD) used to produce the electrical drawings was ineffective, inefficient and costly to produce as they contained an array of errors. In addressing the need to eliminate documentation errors and improve productivity, the cable schedule is used to create a Systems Information Management to develop a 1:1 object orientated model using the software Dynamic Asset Documentation. As a result, of using this approach it is estimated that a 94% cost saving and a substantial improvement in productivity could have been attained in this particular case.
机译:文档错误已被确定为建筑和工程行业中的重要问题。合同文件中包含的错误会导致利润损失,生产率下降,成本和时间超支以及合同纠纷。研究发现,高达60%的建筑和工程项目变化是由于质量差的文档中包含的错误和遗漏造成的。考虑到这一令人震惊的统计数据以及质量差的文档可能对生产率产生的影响,本文中提出的研究对106幅图纸和电缆时间表中的错误进行了分类和量化,这些错误和文档用于记录铁矿石堆垛机输送机的电气组件。研究表明,用于制作电气图纸的计算机辅助设计(CAD)效率低,效率低且成本高,因为它们包含一系列错误。为了解决消除文档错误和提高生产率的需求,电缆时间表用于创建系统信息管理,以使用软件动态资产文档开发1:1面向对象的模型。结果,使用这种方法,据估计在这种特殊情况下可以实现94%的成本节省和生产率的显着提高。

著录项

  • 来源
    《Automation in construction》 |2013年第11期|448-459|共12页
  • 作者单位

    School of Built Environment, Curtin University, GPO Box U1987, Perth, WA, Australia,Center of Sustainable Healthy Buildings, Kyung Hee University, Yongin 446-701, Republic of Korea;

    School of Built Environment, Curtin University, GPO Box U1987, Perth, WA, Australia;

    School of Built Environment, Curtin University, GPO Box U1987, Perth, WA, Australia;

    Depart, of Architectural Engineering, Kyung Hee University, Yongin 446-701, Republic of Korea;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    CAD; Documentation errors; Costs; Productivity; System Information Modeling;

    机译:CAD;文件错误;费用;生产率;系统信息建模;