Fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty

机译:风力不确定性影响下的风电建设项目模糊持续时间预测模型

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Wind energy is one of the most promising renewable energy and wind farm is globally constructed for sustainable development. However, wind could produce adverse effects on some wind-sensitive tasks of wind turbine construction projects. Due to limited understanding of how wind may influence productivity in wind turbine construction project, this research presents a fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty. Through the use of Beaufort scale, professional expertise, and fuzzy membership functions, the productivity loss (PL) subject to various Beaufort scale of wind can be analyzed. With historical wind speed data incorporated, the duration can be simulated and forecasted by the model. Besides, the practicality of the model is demonstrated by an actual wind turbine construction project. The findings from this research are very useful in allocating schedule risk for wind turbine construction projects where wind uncertainty arises. (C) 2017 Elsevier B.V. All rights reserved.
机译:风能是最有前途的可再生能源之一,风电场在全球范围内为可持续发展而建造。但是,风可能会对风力涡轮机建设项目的某些对风敏感的任务产生不利影响。由于对风力如何影响风力涡轮机建设项目的生产率的了解有限,本研究提出了受风力不确定性影响的风力涡轮机建设项目的模糊持续时间预测模型。通过使用Beaufort标尺,专业知识和模糊隶属函数,可以分析受各种Beaufort标尺影响的生产率损失(PL)。结合历史风速数据,可以通过模型模拟和预测持续时间。此外,该模型的实用性通过一个实际的风力涡轮机建设项目得到了证明。这项研究的发现对于在风力不确定性出现的风力涡轮机建设项目中分配进度风险非常有用。 (C)2017 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号