首页> 外文期刊>Automation in construction >Holonic execution system for real-time construction management
【24h】

Holonic execution system for real-time construction management

机译:实时施工管理的定期执行系统

获取原文
获取原文并翻译 | 示例
           

摘要

The latest advances in construction management are leading towards the transition from traditional activity-based to flow-based management, which imposes that a set of flows be considered to reach efficiency. In addition, planning can no longer be limited to the pre-execution phase, because the variability and contingencies that are always encountered in the execution phase ask for dose monitoring and dynamic planning of construction works.These issues have been the subject of well-known research advances, among which, in this paper, online planning and Last Planner System are cited. The core of these approaches is that work progress must be regularly monitored and some decision making models must be available to site managers for them to be able to redirect the work plan during execution. However, this approach is so demanding in terms of communication, computational burden and team collaboration that automation was claimed as the right approach to make it feasible.In this paper it is suggested that holonic management systems can either perform automatic construction site management or support site managers, depending on the level of embedded intelligence. Such systems combine the potentials of hierarchical and heterarchical systems and are capable of self-organisation and multi-objective optimisation. They are designed so as to reason both at a local and global level. As a result, they are safe and do not suffer communication losses or delays. They correctly simulate real world interactions among all the agents typically involved in construction execution and management. A preliminary application for the real-time management of the execution of bored piles in a middle-sized construction site through a holonic management system is presented. Both the system architecture and a possible development platform are defined, so as to assess the potentials of this approach.
机译:施工管理的最新进展导致从传统活动的转型为基于流量的管理,这施加了一系列流动效率。此外,规划不能再限于预先执行阶段,因为在执行阶段始终遇到的可变性和突发事件要求施工工程的剂量监测和动态规划。这些问题一直是众所周知的主题研究进展,其中,在本文中,引用了在线规划和最后一个计划者系统。这些方法的核心是必须定期监测工作进度,并且必须使用某些决策模型来播放现场管理器,以便能够在执行期间重定向工作计划。然而,这种方法对沟通,计算负担和团队合作如此苛刻,使自动化被声称成为使其可行的正确方法。在本文中建议,Holonic Management Systems可以执行自动施工现场管理或支持站点管理者,取决于嵌入式智能的级别。这种系统结合了分层和杂交系统的潜力,并且能够进行自组织和多目标优化。它们的设计是在当地和全球层面的理由。结果,它们是安全的,不遭受沟通损失或延误。他们在通常涉及施工执行和管理方面的所有代理商中正确模拟了真实世界的互动。展示了通过全密管理系统在中型施工现场执行钻孔桩的实时管理的初步应用。定义了系统架构和可能的开发平台,以便评估这种方法的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号