...
首页> 外文期刊>ATW >Earthquake safety Evaluations on track for US nuclear plants
【24h】

Earthquake safety Evaluations on track for US nuclear plants

机译:美国核电站的地震安全评估进展顺利

获取原文
获取原文并翻译 | 示例

摘要

(Nei) Expedited earthquake safety evaluations for U.S. nuclear energy facilities are largely completed and results to date confirm the plants' seismic safety, a senior industry executive said at an Oct. 7 U.S. Nuclear Regulatory Commission briefing for the agency's commissioners. These evaluations, due to the NRC by Dec. 31, will provide an update on seismic safety pending completion of specialized risk studies to be conducted over the next several years. NRC analysis confirms that the nuclear plants "can continue to operate safely while the longer-term plant risk assessments are being completed," Clifford Mun-son, the NRC's senior technical adviser for siting, told the commissioners at an Oct. 7 briefing. "There has not been an overall increase in seismic risk."
机译:(Nei)一位高级工业高管在10月7日美国核监管委员会为该机构专员所作的简报中说,美国核能设施的快速地震安全评估已基本完成,迄今为止的结果证实了该厂的地震安全性。这些评估将在12月31日由NRC进行,它将提供地震安全性的最新信息,直到未来几年进行的专门风险研究完成。 NRC选址的高级技术顾问Clifford Mun-son在10月7日的简报会上告诉委员会,NRC的分析证实,核电厂“可以在完成长期电厂风险评估的同时继续安全运行”。 “地震风险尚未整体增加。”

著录项

  • 来源
    《ATW 》 |2014年第11期| 653-653| 共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号