Project Management for the Decommissioning and Dismantling of Nuclear Facilities

机译:核设施退役和拆除的项目管理

获取原文
获取原文并翻译 | 示例
           

摘要

The decommissioning of nuclear power plants is executed in a classic project manner as it is known from other construction projects. It is obvious to use the known portfolio of project management tools. The complexity that is created by the large size of the project in combination with safety requirements of the nuclear industry has to be handled. Complexity can only be managed addressing two main drivers: Prioritization and speed (agility) in project execution. Prioritization can be realized by applying tools like Earned Value Management. A high speed of project execution is established by applying Agile Management like SCRUM-methods. This method is adopted in the context of the cooperation "Complex Projects" to the needs of nuclear industry.
机译:核电厂的退役以经典的项目方式执行,这在其他建设项目中是众所周知的。很明显,使用已知的项目管理工具组合。必须处理由于项目规模大以及核工业的安全要求而导致的复杂性。只能通过两个主要驱动因素来管理复杂性:项目执行中的优先级和速度(敏捷性)。优先级可以通过应用诸如挣值管理之类的工具来实现。通过应用诸如SCRUM方法之类的敏捷管理,可以实现项目的高速执行。在针对核工业需要的“复杂项目”合作中采用了这种方法。

著录项

  • 来源
    《ATW》 |2015年第12期|724-729|共6页
  • 作者单位

    ENBW Kernkraft GmbH, Steinbruch, D-74382 Neckarwestheim, Germany;

    Drees & Sommer, D-70569 Stuttgart, Germany;

    Drees & Sommer, D-70569 Stuttgart, Germany;

    ENBW Kernkraft GmbH, Steinbruch, D-74382 Neckarwestheim, Germany;

  • 收录信息 美国《科学引文索引》(SCI);
  • 原文格式 PDF
  • 正文语种 ger
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号