...
首页> 外文期刊>Atoms in Japan >TEPCO Holds Ceremony for Completing Kashiwazaki-Kariwa NPS
【24h】

TEPCO Holds Ceremony for Completing Kashiwazaki-Kariwa NPS

机译:东京电力举行柏崎-轮NPS完成仪式

获取原文
获取原文并翻译 | 示例
           

摘要

On October 28, the Tokyo Electric Power Co. (TEPCO) held a ceremony celebrating the completion of the construction of all seven units of Kashiwazaki-Kariwa Nuclear Power Station (NPS), which has a total output of 8,212MW. The ceremony was held in a gymnasium at the plant site. With the start of commercial operation at Unit 7 last July - the final unit in the construction plan - Kashiwazaki-Kariwa NPS now has the largest output of any NPS in the world. The ceremony was held to commemorate the completion of the plan over nearly three decades since 1969, when the two local governments concerned, Kashiwazaki City and Kariwa Village, passed a resolution to invite NPS. About 700 persons, including people concerned and leaders of the local governments, participated in the ceremony. A fresh resolve was made at this occasion to keep plant operation safe in the future.
机译:10月28日,东京电力公司(TEPCO)举行了庆典仪式,庆祝总产量为8,212MW的柏崎崎-Nuclear轮核电站(NPS)所有七个机组的建设。典礼在工厂现场的体育馆举行。随着去年7月7号机组的商业化运营(建设计划的最后一个单元),柏崎-轮NPS现在的产量是世界上NPS最多的。该仪式是为了纪念该计划自1969年以来近三十年的完成而举行的。当时,有关的两个地方政府(柏崎市和K洼村)通过了一项邀请NPS的决议。包括有关人士和地方政府领导人在内的约700人参加了典礼。这次会议上做出了新的决定,以确保将来工厂的运行安全。

著录项

  • 来源
    《Atoms in Japan》 |1997年第12期|p.11-17|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 基础理论;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号