Adani Power shuts down four units of 660MW each at Tiroda Plant in Maharashtra due to acute water shortage. Only one unit is currently active and working. Tiroda Power Plant gets water under a long term arrangement from Dhapewada Project of Vidarbha Irrigation Development Corporation. Due to drought conditions in the State of Maharashtra, the water dam has dried up and is unable to supply water to the Tiroda Power Plant.
展开▼