首页> 外文会议>International Scientific Conference on Power and Electrical Engineering of Riga Technical University >Towards optimization of combined cycle power plants' start-ups and shut-down
【24h】

Towards optimization of combined cycle power plants' start-ups and shut-down

机译:致力于优化联合循环发电厂的启动和关闭

获取原文

摘要

New running conditions of power plants - provoked by volatility of market price and integration of variable renewable energy sources (RES) into energy production process - refer to frequent start-ups (run-ups) and shut-downs, which are costly and detrimental. The procedure of run-up is more adverse than the shut-down. The optimization of start-up is an essential feature to provide operational benefits and economic success of cogeneration units in a liberalized market. In this publication the run-ups of Riga CHP-2 plant are evaluated by analyzing operational data from condition monitoring system (CMS). The obtained results reflect that the improvement of cogeneration units' start-ups is necessary. The weakest points of it are marked and potential options of upgrades are noted. Also the study about shut-downs is provided in this research work.
机译:发电厂的新运行状况是由市场价格波动以及将可变可再生能源(RES)集成到能源生产过程中引起的,是指频繁的启动(启动)和关闭,这既昂贵又有害。启动过程比关闭过程不利。优化启动是在自由化市场中提供热电联产机组运营收益和经济成功的基本特征。在该出版物中,通过分析来自状态监控系统(CMS)的运行数据来评估Riga CHP-2工厂的运行情况。获得的结果表明,有必要改善热电联产机组的启动。标记了它的最薄弱点,并指出了可能的升级选项。在这项研究工作中还提供了有关关机的研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号