首页> 外文期刊>Asian Power >Are renewables at risk in Indonesia's new plan?
【24h】

Are renewables at risk in Indonesia's new plan?

机译:在印度尼西亚的新计划中是可再生的风险吗?

获取原文
获取原文并翻译 | 示例
           

摘要

Indonesia's new Electricity Supply Business Plan 2019 (RUPTL) slashed the forecast for electricity demand growth to 6.42% for 2019-2028 (from 6.86% for 2018-2027) as a response to criticisms of the reliability of past estimates. However, Institute of Energy Economics and Financial Analysis (IEEFA) energy finance consultant Melissa Brown argued that the lower forecast could only urge much bigger cutbacks in planned grid expenditures for transmission and distribution (T&D) including additions for network and distribution substations, and thus curb future renewable capacity additions.
机译:2019年印度尼西亚的新电力供应商业计划(Ruptl)将电力需求增长的预测削减至2019-2028的6.42%(2018-2027人的6.86%)是对对过去估计的可靠性批评的回应。然而,能源经济学和财务分析研究所(IEEFA)能源财务顾问Melissa Brown认为,下降的预测只能在计划的网格支出中促进更大的削减,用于传输和分配(T&D),包括网络和分配变电站的添加,从而抑制未来的可再生能力增加。

著录项

  • 来源
    《Asian Power》 |2019年第92期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号