...
首页> 外文期刊>Asian Journal of Technology Innovation >Platform design and imitative innovation inside the transition black-box: Korean nuclear power plant APR1400 case
【24h】

Platform design and imitative innovation inside the transition black-box: Korean nuclear power plant APR1400 case

机译:过渡黑匣子内部的平台设计和模仿创新:韩国核电站APR1400机壳

获取原文
获取原文并翻译 | 示例

摘要

This research focuses on a platform-design building momentum and an imitative innovation capability for the successful transition of a catch-up country into its post catch-up stage. Through the analysis of Korean nuclear power plant APR 1400 development case with its specific process inside the transition black-box, APR 1400 is proposed as a platform design with a common technological architecture that is indigenously established by Korea through a partial reconfiguration of the dominant design imported from leading countries. APR1400 has also been playing as a distinctive transition momentum for driving Korea into its post catch-up stage with various derivatives more concurrently, by providing Korea with the critically significant means of retrieving and reusing the existing knowledge rather diffusely accumulated during its catch-up stage into a more relevant one for transition.
机译:这项研究的重点是平台设计的发展动力和模仿创新能力,以使追赶国家成功过渡到追赶后阶段。通过分析韩国核电厂APR 1400开发案例及其在过渡黑匣子内的特定过程,提出APR 1400是一种具有通用技术架构的平台设计,该技术是韩国通过对主导设计的部分重新配置而固有建立的从领先国家进口。 APR1400还发挥了独特的过渡势头,通过向韩国提供在追赶阶段相当分散地积累和利用现有知识的极为重要的手段,使韩国同时进入各种衍生工具,从而使其步入追赶阶段。成为更相关的过渡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号