In this paper, we consider parallel-machine scheduling with past-sequence-dependent (p-s-d) delivery times and deteriorating maintenance. The delivery time of a job is proportional to its waiting time in the system. Each machine has a deteriorating maintenance activity, i.e., delaying the maintenance increases the time required to perform it. We consider three versions of the problem to minimize the total absolute deviation of job completion times, the total load on all the machines, and the total completion time. We develop polynomial-time algorithms to solve them.
机译:在本文中,我们考虑具有过去序列依赖的交付时间和恶化的维护的并行机器调度。作业的交付时间与其在系统中的等待时间成正比。每台机器都有恶化的维护活动,即,延迟维护会增加执行该设备所需的时间。我们考虑问题的三个版本,以最大程度地减少作业完成时间的总绝对偏差,所有机器上的总负载以及总完成时间。我们开发多项式时间算法来解决它们。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号