首页> 外文期刊>ASHRAE Transactions >Hot Water Distribution System Piping Time, Water, and Energy Waste— Phase Ⅰ: Test Results
【24h】

Hot Water Distribution System Piping Time, Water, and Energy Waste— Phase Ⅰ: Test Results

机译:热水分配系统的配管时间,水和能源浪费—第一阶段:测试结果

获取原文
获取原文并翻译 | 示例
       

摘要

This paper describes results of recent laboratory tests on a variety of common hot water distribution system piping sizes and types under a variety of flow rates, temperatures, and environmental conditions. The tests measured the time spent waiting for hot water to arrive affixtures and the amount of water wasted to drain while waiting. From these, the energy waste associated with the water waste can be computed. Results are presented as plots of the ratio of actual flow volume divided by pipe volume (AF/PV) vs. flow rate, temperature, and other parameters of importance. Several unanticipated flow regimes were observed that dramatically alter behavior from what might be expected based on either plug flow or fully developed flow theory.
机译:本文介绍了最近在各种流量,温度和环境条件下,对各种常见的热水分配系统管道尺寸和类型进行的实验室测试的结果。该测试测量了等待热水到达固定装置所花费的时间以及等待期间浪费掉的水量。根据这些,可以计算出与水浪费有关的能量浪费。结果以实际流量除以管道体积(AF / PV)的比值对流量,温度和其他重要参数的曲线图表示。观察到了几种无法预料的流态,这些流态大大改变了基于塞流或完全发展的流理论所预期的行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号