首页> 外文期刊>ASHRAE Transactions >Hot-Water Distribution System Piping Time,Water, and Energy Waste—Phase III: Test Results
【24h】

Hot-Water Distribution System Piping Time,Water, and Energy Waste—Phase III: Test Results

机译:热水分配系统的配管时间,水和能源浪费-第三阶段:测试结果

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes results of recent laboratory tests on additional common hot-water distribution system piping sizes and types under a variety of flow rate, temperature, and environmental conditions. The new tests include chlorinated poly-vinyl chloride (CPVC) and high-density cross-linked polyethylene (PEX) piping. They also include attic and floor environments. The tests measured the time spent waiting for hot water to arrive at fixtures and the amount of water wasted to drain while waiting. From these, the energy waste associated with the water waste can be computed. Results are presented as plots of the ratio of actual flow volume divided by pipe volume (AF/PV) vs. flow rate, temperatures, and other parameters of importance. Several unanticipated flow regimes were observed that dramatically alter behavior from what might be expected based on either plug-flow or fully developed flow theory. A separate related paper discusses piping heat loss UA factors that were measured.
机译:本文介绍了最近在各种流量,温度和环境条件下对其他常见的热水分配系统管道尺寸和类型进行实验室测试的结果。新测试包括氯化聚氯乙烯(CPVC)和高密度交联聚乙烯(PEX)管道。它们还包括阁楼和地板环境。测试测量了等待热水到达固定装置所花费的时间以及等待期间浪费掉的水量。根据这些,可以计算出与水浪费有关的能量浪费。结果显示为实际流量除以管道体积(AF / PV)随流量,温度和其他重要参数的比值图。观察到了几种无法预料的流动状态,这些行为大大改变了基于活塞流或完全发展的流动理论所预期的行为。另一篇相关文章讨论了已测量的管道热损失UA因子。

著录项

  • 来源
    《ASHRAE Transactions》 |2011年第2011期|p.742-754|共13页
  • 作者

    Carl C. Hiller;

  • 作者单位

    president of Applied Energy Technology Co., Davis, CA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号