首页> 外文期刊>Archives of Civil Engineering >FIRSTS POST-TENSIONED SLAB BRIDGES IN POLAND THE BRIDGE IN PAWIA STREET IN LUBLIN
【24h】

FIRSTS POST-TENSIONED SLAB BRIDGES IN POLAND THE BRIDGE IN PAWIA STREET IN LUBLIN

机译:首先,波兰波兰的后张力板桥在卢布林的Pawia街的桥梁

获取原文
获取原文并翻译 | 示例
           

摘要

The analysis was focused on three post-tensioned slab bridges, constructed in 1950s. Two of them function normally and will probably achieve the life span of 100 years required by the relevant regulations. The third one will likely be demolished soon and replaced with a new reinforced concrete frame bridge. To its degradation contributed the faulty diagnosis of its technical condition during its periodic technical inspections. The introduction briefly characterises the development of the prestressed structure theories reviewing papers on concrete rheology and monographs looking into prestressing. The paper is based on the existing fragments of the technical design documents concerning the bridges in question. The bridges were designed by Polish civil engineers.
机译:分析专注于三个后张扣板桥,于20世纪50年代建造。其中两个正常运作,可能会达到有关规定所要求的100年的寿命。第三个可能很快拆除并用新的钢筋混凝土框架桥替换。在其定期技术检查期间,其降解导致其技术条件的错误诊断。该引言简要介绍了预应力结构理论的发展,审查了关于具体流变学和看预应力的专着的论文。本文基于有关有关桥梁的技术设计文件的现有碎片。桥梁由波兰土木工程师设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号