MODELLING DELAYS IN BRIDGE CONSTRUCTION PROJECTS BASED ON THE LOGIT AND PROBIT REGRESSION

机译:基于Logit&Probit回归的桥梁建设项目建模延迟

获取原文
获取原文并翻译 | 示例
           

摘要

Construction projects, even exemplarily planned and organized, bear a risk of unforeseen events and problems which can result in completion of the works after the deadline, that is delays. The construction of bridges is an inseparable part of road and rail projects and construction and expansion of the transport network. The paper aims at finding a relationship between the independent variables characterizing bridge projects and the delays during their implementation. Two alternative models were proposed to solve the problem: logit and probit. The data set comprising road and rail bridges built in Poland in the last 12 years (2005 - 2017) was used to build the models. The evaluation, quality and accuracy parameters of proposed models were determined in the final part of the paper.
机译:建设项目甚至示例性计划和组织,承担了可能导致在截止日期之后完成工作的不可预见的事件和问题的风险,这是延迟的。桥梁的建设是路和铁路项目的不可分割的一部分,以及运输网络的建设和扩展。本文旨在找到独立变量在其实施过程中表征桥梁项目的关系和延迟。提出了两种替代模型来解决问题:Logit和Probit。包括在过去12年(2005年至2017年)的波兰内置的道路和轨道桥梁的数据集被用来建立模型。建议模型的评估,质量和准确性参数在纸张的最后一部分中确定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号