Solution to the Problem of Inaccurate Duration-Estimation: Relational Database Model for Design/Build Organizations

机译:工期估算不准确的解决方案:设计/建造组织的关系数据库模型

获取原文
获取原文并翻译 | 示例
       

摘要

For various participants of projects, accuracy in the estimation of project duration is vital at various stages of the building production process. The importance of the problem has been acknowledged by the industry worldwide, and various models have been proposed in the literature, but all have their limitations. This paper presents a performance-based duration-estimation model that utilizes historical knowledge, in particular information to estimate the worst, best and likely variances of current projects by using the unified structure of an information system developed for design/build organizations. The model allows the estimators to make use of data on past projects. Proposed organizational pattern, design/build, are vital for accessing the as-built schedules and variance information provided by construction groups in a design/build organizational pattern. Our final solution includes an integrated relational database model developed for design/build organizations that provides the integration of satellite software packages, thus eliminating additional efforts for obtaining the data needed in the estimation process.
机译:对于项目的各个参与者,在建筑物生产过程的各个阶段,估计项目工期的准确性至关重要。该问题的重要性已被全球工业界所认可,并且文献中已经提出了各种模型,但是它们都有其局限性。本文提出了一个基于绩效的工期估算模型,该模型利用历史知识,尤其是信息,通过使用为设计/建造组织开发的信息系统的统一结构来估算当前项目的最坏,最好和可能的差异。该模型允许估算者使用过去项目中的数据。提议的组织模式(设计/构建)对于访问设计/构建组织模式中的施工组提供的竣工进度表和差异信息至关重要。我们的最终解决方案包括为设计/建造组织开发的集成关系数据库模型,该模型提供了卫星软件包的集成,从而省去了在估算过程中获取所需数据的额外工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号