...
首页> 外文期刊>Arabian Journal of Geosciences >Determination of the transient water table rise behind constructed underground dams
【24h】

Determination of the transient water table rise behind constructed underground dams

机译:确定地下地下大坝后临时地下水位上升的方法

获取原文
获取原文并翻译 | 示例

摘要

The predicted relationship between water table rise and time behind a constructed underground dam is established in this paper based on a semi-physically based approach. This approach utilizes values of the most effective actual groundwater aquifer properties. Robustness of this approach was tested by applying it to a number of proposed underground dam sites in two real aquifers, in addition to a number of hypothetical cases. Results were compared with MODFLOW simulation outputs for these cases, and the comparison is found to be very encouraging.
机译:本文基于半物理方法,建立了地下水位上升与地下大坝建造时间之间的预测关系。这种方法利用了最有效的实际地下水含水层特性值。除许多假设情况外,还通过将其应用于两个实际含水层中的许多拟建地下坝址,对这种方法的鲁棒性进行了测试。在这些情况下,将结果与MODFLOW仿真输出进行了比较,发现比较令人鼓舞。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号