首页> 外文期刊>Aquatic ecosystem health & management >Domestic wastewater treatment using tidal-flow cinder bed with Cyperus alternifolius
【24h】

Domestic wastewater treatment using tidal-flow cinder bed with Cyperus alternifolius

机译:交替尿莎草潮汐煤渣床处理生活污水

获取原文
获取原文并翻译 | 示例
           

摘要

A lab-scale vertical flow cinder bed was set up to treat domestic wastewater. Cinder, which is a common coal waste from electricity generation, was used as the filter medium in the six vertical flow column beds in this study. Three of the six columns were planted with umbrella grass (Cyperus alternifolius) to mimic a wetland system and to investigate the effects of plant on the pollutant removal efficiencies of the column bed systems. The six column beds were divided into three groups, operating with different durations of "wet" and "dry"periods. Group 2 column beds, with 4 hours "wet"periods and 4 hours "dry"periods, showed the highest carbonaceous removal. And similar ammonia nitrogen removal efficiencies were demonstrated in column beds of group 2 and in column beds of group 3 (6 hours "wet" periods and 2 hours "dry" periods). Phosphorus removal efficiencies were not significantly different in all groups of column bed. No significant differences in pollutant removal were observed between planted and unplanted column beds in this study (p > 0.05).
机译:建立了实验室规模的垂直流煤渣床来处理生活污水。在本研究中,煤渣是发电产生的常见煤渣,被用作六个垂直流柱床中的过滤介质。六根色谱柱中的三根种植有伞草(Cyperus alternifolius),以模拟湿地系统,并研究植物对柱床系统污染物去除效率的影响。将六个柱床分为三组,以“湿”和“干”时期的不同持续时间进行操作。具有4小时“湿”时段和4小时“干”时段的第2组柱床显示出最高的含碳量。在第2组的柱床和第3组的柱床(6小时的“湿”期和2小时的“干”期)中也证明了相似的氨氮去除效率。所有柱床组的除磷效率均无显着差异。在该研究中,未种植和未种植的柱床在污染物去除方面均未观察到显着差异(p> 0.05)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号