The TESLA Test Facility (TTF), under construction and commissioning at DESY International Collaboration, is an R&D test bench for the superconducting option for future linear electron-position colliders. TTF consists of an infrastructure to process and test the SC cavities and of a 400 MeV linac (Phase I), to be upgraded up to 1.2 GeV (Phase II). The infrastructure is fully operational and the first cryomodule of the three planned for Phase I has been successfully in operation since June 1997. Each cryomodule contains eighty nine cell. Cavities at 1.3 GHz. The planned performances (15 MV/m with a Q of 3 10/sup 9/) have been outreached. The achievements on cavity development and cryomodule design allow expected cavity operation at 20 MV/m (at least) in the second cryomodule, that is planned to be in operation by November 1998. The TESLA goal of 25 MV/m is expected for the last six modules. An overview of the facility and of the results obtained so far in the critical technologies are presented in this paper, with a particular focus on the superconducting cavities.
机译:TESLA测试设施(TTF)是由DESY International Collaboration建造和调试的,是用于未来线性电子位置对撞机超导选件的研发测试台。 TTF包括一个用于处理和测试SC腔的基础设施,以及一个400 MeV直线加速器(第一阶段),可以将其升级到1.2 GeV(第二阶段)。基础设施已全面运行,并且自1997年6月以来,第一阶段计划的三个低温模块已成功运行。每个低温模块包含89个单元。 1.3 GHz的腔。已超出计划的性能(15 MV / m,Q为3 10 / sup 9 /)。腔体开发和低温模块设计方面的成就使得计划在1998年11月投入运行的第二个低温模块中腔体的预期运行速度至少为20 MV /m。TESLA的目标是最后一次达到25 MV / m。六个模块。本文介绍了该设备的概述以及迄今为止在关键技术中获得的结果,尤其着眼于超导腔。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号